Issue |
Eur. Phys. J. Appl. Phys.
Volume 59, Number 1, July 2012
|
|
---|---|---|
Article Number | 10102 | |
Number of page(s) | 9 | |
Section | Semiconductors and Devices | |
DOI | https://doi.org/10.1051/epjap/2012120106 | |
Published online | 16 July 2012 |
https://doi.org/10.1051/epjap/2012120106
Numerical investigation of the effect of optical pulse position on the response of an unbiased BGMSM photodetector using ADI method
1
Department of Photonics, Kerman Graduate University of Technology, Kerman, Iran
2
Physics Group, Guilan University, Rasht, Iran
a e-mail: mashhr@guilan.ac.ir
A numerical method for describing the electrical response of a Back-Gated Metal-Semiconductor- Metal Photodetector (BGMSM-PD) to an impinging optical pulse on the active region of the device is presented. In the absence of external voltage, the main mechanism for the transport of photo-generated carriers is diffusion mechanism. Two nonlinear differential equations describe the behavior of photocarriers’ densities in the device medium with respect to time and position. Having linearized the parabolic partial differential equations, the time evolution of carrier densities is calculated using the Alternating Direction Implicit (ADI) method. The numerical results show good agreement with the experimental data. Both experimental and numerical findings confirm that the electrical response of the device to optical pulses with spatial FWHM comparable with the width of the active region is dependent on pulse position on the active region. This feature of the device makes it to be a good candidate as position sensors in places where micro-positioning is required.
© EDP Sciences, 2012
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.